2013年7月2日星期二

shoe making process-two


Six, semi-finished products warehouse management
1, semi-finished products warehouse is a footwear production process during the face and the bottom of the transit station 2, semi-finished products warehouse management should be based on the production sequence table scheduled time, time to give sewing workshop urged, while the hair clip to help molding workshop materials and give control; 3, in the uppers, soles sends the material before molding workshop to help folder, semi warehouse managers must pay particular attention to press process sheets, first do the number of statistical quality management and work four, each order must get ready to help surface, in the end, outsole, insole, inner box, carton, paper labels and other materials, only sends the material to folders to help molding workshop 5, shall be determined by the number of the last head set number of revolutions per day production, molding workshop the production of 6 Sheets collection, the whole plant is scheduled for 7 schedule, completing daily production performance table (quantity of people, picking quantity, inventory number and the production line dynamic) men shoes manufacturer

Seven, clip molding workshop to help manage
1 clip to help process includes pre, mid, and help after three part two, worn shoes and bow length should be from sub-standard use (available colors to distinguish its length) 3, to help the former folder must pay particular attention to upper part aligned with the last head, do not skew, while paying attention to the first fixed standard height heel. 4, the folder to the attention of two waist to help uppers really taut, tense to moderate its average. 5, folder and then help to pay attention to heel height is in accordance with the standard, if the height of each heel has followed standard notation meet lasts, it will not happen left and right foot shoe shoes high inconsistency. After completion to help remove the nail in the bottom to facilitate removal lasts, avoid wearing shoes foot injury. 6, the clip should be set up to help process quality inspectors, on the folder manually adjusted to give help remedy bad vamps.

Eight, eraser and stickers bottom molding
1, note that the accuracy of marking plate, so that air pressure of about 0. 6MPa; 2, the curvature of kibble after marking shall be removed by the leather surface paints. 3, large bottom surface to be bonded drug treatment 4, heating should be at 100 ℃ ± 5 ℃ about 5, posted before the end of uppers and soles should be noted that the correctness of the glue brush and uniformity, vamps and non-polluting soles; 6, shoe soles fit, employees should note affixed to the bottom can not skew the edge of the shoes have to use airbags or three-dimensional block compactor pressure at the end 7, the pressure at the end, the operator should be noted that pressure at the end The use of machine accuracy, and attention to the pressing time (5-8S), pressure (20-40KN) control 8, pressing completed: vulcanized shoes: shoes must be placed collection tank for sulfur vulcanization stereotypes ; cold sticky shoes: shoes must be set in a freezer for frozen stereotypes. 9, the pressure after the end of the shoes in the last head is not completely cooled before molding is best not to disconnect lasts, so the shoes will be deformed.

Nine, sorting and packaging
1, after the removal of the last head, shoes to go through the preliminary sorting and external cleaning; 2, you need to light finishing spray, spray light to properly deploy agents, spray light should be uniform and can be focused; 3, into the insole, and properly glue prison; 4, 5 on the laces, final cleaning finishing, packing paper into the toe; 6, the final quality inspection 7, into a shoebox or plastic bags 8, packing

Ten, shoe production line other equipment required
1, cutting, blanking die cutter used, depending on shoe design based on standardized paperboard; 2, molding lasts, can be divided into plastic and aluminum lasts lasts, the general production of cold sticky shoes because last type of change compared with the Plastic lasts more economical, sports shoes or sandals larger quantities to the use of aluminum last as well. A molding production line about 800-1200 pairs; 3, sandwiched help group and sample room staff in quality control personnel to use the beak pliers, a molding production line shall keep 8-10 branches; 4, playing eyelet hole with a punching die, depending on shoes face design standard cardboard to build five, clip help when away from the wide heel shoes fixed bow, according to shoe design used by shoe size segment; 6, roughened with a wire wheel, in addition to plastic with a nylon brush 7, handmade coarse grinding machine , decontamination spray gun, marker, etc. sporadic equipment;

没有评论:

发表评论